Gorgon LNG / Barrow Island tanker analytics
Australia · lng · export
0
In Port Now
0
Arrivals (7d)
0
Departures (7d)
-
Avg DWT
Monthly LNG shipments, mln tonnes
Hover a month to see shipment data by year.
Reference rows are reported monthly values. AIS estimate rows use TankerMap LNG vessel positions; port-call fallback rows use confirmed calls where AIS attribution is incomplete. Current-month/provisional and low confidence labels stay visible until reviewed.
Daily Traffic — Last 90 Days
Estimated liquid petroleum capacity only. Crude oil and oil products are included; LNG is excluded.
Live Map
🗺️ View on mapRecent Calls
| Vessel | Type | Event | Event date | DWT |
|---|---|---|---|---|
| No recent calls | ||||
About Gorgon LNG / Barrow Island
The world's largest single-resource LNG project, located on Barrow Island off the northwest coast of Western Australia. Gorgon has three trains with a combined capacity of approximately 15.6 MTPA, processing gas from the offshore Gorgon and Jansz-Io fields. The project is operated by Chevron (47.3%) with ExxonMobil and Shell as partners. At over US$54 billion, Gorgon was one of the most expensive resource projects ever built. Barrow Island is a Class A nature reserve, requiring extraordinary environmental controls during construction and operation, including a large-scale carbon capture and storage (CCS) system injecting CO₂ into a deep reservoir beneath the island.
Port Details
Country
Australia
Commodity
lng
Direction
export
Operator
Chevron (Gorgon LNG)
Berths
2
Capacity
15.6 MTPA